Make transfer posting through transaction MB1B Movement type 542, from vendor stock to stor.GI for scrapping the material:- Now we need to make goods issue of material which are confirmed to be scrapped from the system.through transaction MB1a Movement type 551- GI for scrapping plant & scrap storage location and for material which refers to perticular profit center as per product hierarchy. Scenario 1 :- Production line rejection is generated at the time of production, so confirming the scrap at the time of production order confirmation in transaction Co11N,Įnter raw material/semifinished material (whichever has been detected as scrap) and scrap qty 2 pcs for example, Scrap location & movement type 531 and choose save.Īfter saving the ok qty will flow in usable stock and the scrap qty will flow in scrap location as a receipt by-product. Scenario 4 :- customer returns (scrap handling)Īll scenario required a seperate scrap location which is excluded from MRP area, Scenario 3 :- supplier returns (scrap handling) Scenario 2 :- scrap generated at subcontractor (for Indian scenario) Scenario 1 :- scrap generated during manufacturing ( production line rejections) The basic purpose of this blog post is to share the way to manage scrap generated in a discrete manufacturing industry for below said scenarios, as some companies prefer to make scrap management & accounting from of SAP.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |